Material: | Carbon Steel ASTM A53 | Connection: | Male Thread |
---|---|---|---|
Application: | Gas ,Water,Fire Protection,Home | Technics: | ERW, Forged |
High Light: | schedule 40 carbon steel pipe,galvanized steel pipe nipple |
SCH40 GALVANIZED PIPE NIPPLES ASTM A53.pdf
Schedule 40 Welded Steel Pipe Nipples - Galvanized
1. american standard ASTM A733
2. carbon & stainless steel
3. black & galvanized
4. sch40, sch80...
5. NPT ANSI B1.20.1
6. nipples with seam, seamless nipples
7. both end threads, one end thread, close, merchant couplings
8. origin: made in China
9. type TOE, TBE
B | A Length | |||||||||||||||||
Pipe Size | Pipe O.D. | Close | Space | |||||||||||||||
1/8” | 0.405 | 3/4" | 1 1/2 | 2 | 2 1/2 | 3 | 3 1/2 | 4 | 4 1/2 | 5 | 5 1/2 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
1/4” | 0.54 | 7/8" | 1 1/2 | 2 | 2 1/2 | 3 | 3 1/2 | 4 | 4 1/2 | 5 | 5 1/2 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
3/8” | 0.675 | 1 | 1 1/2 | 2 | 2 1/2 | 3 | 3 1/2 | 4 | 4 1/2 | 5 | 5 1/2 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
1/2” | 0.84 | 1 1/8 | 1 1/2 | 2 | 2 1/2 | 3 | 3 1/2 | 4 | 4 1/2 | 5 | 5 1/2 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
3/4” | 1.05 | 1 3/8 | 1 1/2 | 2 | 2 1/2 | 3 | 3 1/2 | 4 | 4 1/2 | 5 | 5 1/2 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
1” | 1.315 | 1 1/2 | 2 | 2 1/2 | 3 | 3 1/2 | 4 | 4 1/2 | 5 | 5 1/2 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | |
11/4” | 1.66 | 1 5/8 | 2 | 2 1/2 | 3 | 3 1/2 | 4 | 4 1/2 | 5 | 5 1/2 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | |
11/2” | 1.9 | 1 3/4 | 2 | 2 1/2 | 3 | 3 1/2 | 4 | 4 1/2 | 5 | 5 1/2 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | |
2” | 2.375 | 2 | 2 1/2 | 3 | 3 1/2 | 4 | 4 1/2 | 5 | 5 1/2 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||
21/2” | 2.875 | 2 1/2 | 3 | 3 1/2 | 4 | 4 1/2 | 5 | 5 1/2 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | |||
3” | 3.5 | 2 5/8 | 3 | 3 1/2 | 4 | 4 1/2 | 5 | 5 1/2 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | |||
4” | 4.5 | 2 7/8 | 4 | 4 1/2 | 5 | 5 1/2 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | |||||
5” | 5.563 | 3 | 4 1/2 | 5 | 5 1/2 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||||
6” | 6.625 | 3 1/8 | 4 1/2 | 5 | 5 1/2 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | ||||||
8” | 8.625 | 3 1/2 | 4 1/2 | 5 | 5 1/2 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
STEEL PIPE NIPPLE DETAILS
Material | 1.Carbon steel 2.Stainless steel |
British Standard | Threads:BS21 |
DIN Standard | Threads:DIN2999 |
American Standard | Threads:ASTM A865, ASTM A733 |
Hydraulic Test | Test Pressure: Max2.5MPa |
Working Pressure: Max2.5MPa | |
Model | Thread both end nipple, thread one end nipple, close/full nipple |
Surface | 1.Galvanized 2.Electro galvanised 3.normal black 4.sand blasting |
Size | OD:1/8''-6'' |
WT: SCH20, SCH40, SCH60, SCH80, SC100, SCH120, SCH160, STD, xs, xxs, CLASS A, CLASS B, CLASS C etc | |
Length: Standard or Special | |
Series | Heavy series, Standard series, Mediun series, Light series |
Connection | Male |
Shape | Equal |
Certificate | ISO, BV |
Customers' drawing or designs are available. |
Packaging & Delivery
1. Prompt deliver at the very day.
2. Sophisticated and professional logistic agent.
3. Well-trained and disciplined packing team.
4. After-sale service:. Any questions or problems after receiving the product, please feel free to contact us. Problems would be solved for you immediately.
Competitive Advantages
1. We offer high quality products at competitive price in quick delivery.
2. 100% custom pass guaranteed.
3. Good after-sale service.
4. Flexible and Untraceable payment terms.
5. Our products have been exported to Germany, Norway, Poland, Finland, Spain, UK, France, Russia, USA, Brazil, Mexico, Australia, Japan, Korea, Thailand, Indonesia, Uruguay and many other countries.
A: We are manufacture.
Q: What's your MOQ ?
A: MOQ is 1000 usually. But MOQ of each product is different.
Q: Can I get a sample for testing ?
A: Yes, we can provide you a sample for reference, but you may pay for the sample and shipping fee.
Q: Can you provide OEM/ODM service?
A: Sure, we are ready to meet all your demands!
Q: Can I print my logo on the products ?
A: Yes, we can print your logo on the products as you required.
Q: What's the lead time?
A: It will be 1-5 days for sample and 2-12 days for bulk order, it depends on your required.
Q: What's the payment term?
A: We accept T/T, western union, L/C and Trade Assurance. For bulk order by T/T and Western Union, we will require 30% deposit first and 70% balance before delivery.